What the buyer is asking for
Full replacement of existing station footbridge between Platforms 1&2 at West Horndon Station, with new covered Beacon station footbridge including passenger lifts.
Summary from the public notice — the full documents, lots and questions are on Find a Tender.
Civils & groundworks published 30 Oct
BALFOUR BEATTY CIVIL ENGINEERING LIMITED📍 London · E145HU💷 £500kDeadline 13 NovSME-friendly
The Lower Thames Crossing Roads North Programme is seeking expressions of interest from organisations with experience in the design support, manufacture, supply and installation of bridge bearings for major highway and infrastructure projects. The scope comprises the provision of specialist bridge bearing product and m…
Civils & groundworks published 5 Nov
Elmbridge Borough Council📍 London · KT10 9SD💷 £50kDeadline 19 Nov
1.1 Elmbridge Borough Council is approaching the market seeking a contractor to supply and install Kirby bike racks and Rounded A racks (see reference images of both below – fig 1 and 2) across various sites across the Elmbridge borough. There will be a minimum of 11 sites and a minimum of 6 bike racks per site to inst…
Civils & groundworks published 27 Oct
Royal Borough of Greenwich📍 London · SE18 6HQ💷 £380kDeadline 1 Dec
The Contractor shall undertake inspection, repair, replacement, fabrication, installation, and maintenance of metalwork elements. This is a three-year contract.
Civils & groundworks published 23 Oct
Thurrock Council📍 London · RM17 6SL💷 £3.6mDeadline 4 Dec
The Authority’s requirement under this Contract is for a Principal Contractor for the demolition of existing garages, and the design and construction of 11 (eleven) new build units with associated landscaping, boundary treatment, car parking and cycle parking in Anton Road (North & South), South Ockendon, Essex.